G. ADJACENT UTILITIES

Information about the utilities adjacent to the study roadways were obtained from NDOT (see Appendix L). NDOT provided permit information for every active permit along each corridor. Permits are required when there is any construction within NDOT right-of-way, including underground and overhead. The information below details the various permits.

There is also a 6" natural gas pipeline that traverses Eureka County and crosses I-80 between Beowawe and Primeaux Springs. The pipeline continues east toward Elko on the north side of I-80 (see Exhibit 3a). A second 12" pipe parallels the 6" between the Palisade exit on I-80 (exit 281) and Elko.