Report Cover — 1 Page 556 KB
Acknowledgments — 1 Page 50 KB
I. Executive Summary — 5 Pages 60 KB
Table of Contents — 1 Pages 80 KB
II. Introduction — 2 Pages 90 KB
III. Union Pacific Railroad Corridor — 54 Pages 5.6 MB
IV. U.S. Highway 50, State Route 278, and Interstate Highway 80 Corridors — 35 Pages 5.7 MB
Exhibits 1 Location Map and Map Index — 1 Page 100 KB
Exhibits 2a Union Pacific Corridor west — 1 Page 100 KB
Exhibits 2b. Union Pacific Corridor east — 1 Page 120 KB
Exhibits 3a. Interstate 80 Corridor west — 1 Page 135 KB
Exhibits 3 b. Interstate 80 Corridor east — 1 Page 120 KB
Exhibits 4 State Route 278 Corridor north — 1 Page 170 KB
Exhibits 5 State Route 278 Corridor central — 1 Page 175 KB
Exhibits 6 State Route 278 Corridor south — 1 Page 175 KB
Exhibits 7 U.S. Highway 50 Corridor — 1 Page 180 KB
Exhibits 8 Carlin Interchange Configuration — 1 Page 100 KB
Appendix A — References, annotated — 7 Pages 83KB
Appendix B — Rail Accidents — 1 Pages 80KB
Appendix C — Photos Carlin derailment — 12 Pages 1.MB
Appendix D — Wildland Fires Caused by Railroad Operations — 1 Pages 70 KB
Appendix F — American Association of Railroads Circular No. OT-55-G: Recommended railroad operating procedures for the transportation of hazardous waste — 14 Pages 60 KB
Appendix G. — Department of Energy July, 2005 policy statement regarding shipment of waste to Yucca Mountain by dedicated trains — 1 Pages 16 KB
Appendix H — Letter from Nevada Senators Harry Reid and John Ensign to DOE regarding DOE policy statement for use of dedicated trains for waste shipment — 3 Pages 20 KB
Appendix I — Rail and highway regulations relative to the transportation of radioactive materials and their applicability to states, tribes, shippers, and carriers — 3 Pages 20 KB
Table of Contents | Executive SummaryHome – Yucca Mountain.org